| 01-Sep-03 |
Insulating the Firewall Part 4 |
Insulation Presentation
|
| The new double back foil insulation was cut and applied to the remaining areas. The seams and even the outer edges were sealed with foil tape as is visible along the top of the cowl under the windshield. |
 |
When everything was covered, it was time to start installing stuff under the dash! |
 |
The first thing to go back in place was the MSD box and coil. Having threaded T-nuts to hold them in place makes installation easy |
 |
The A/C evaporator supports and vacuum switches were installed next. |
 |
|
|
 |
|